Project Planning Department

A dedicated planning function that schedules, sequences and tracks every job — from raw material and machining through fabrication, coating, assembly and QC — so each order is delivered on time.

Echaar Project Planning Department reviewing a project schedule
Shared across divisions

Planning that keeps every order on schedule

Echaar's Project Planning Department is the control room of the shop floor — it breaks each order into stages, books capacity across our machines and processes, and follows every part until it is inspected, packed and dispatched.

Because design, machining, fabrication, coating, assembly and QC all sit under one roof, planning has direct sight of every operation. Material availability, machine loading and delivery commitments are managed as one continuous flow — the discipline behind 48 years of dependable, traceable delivery for both the Precision Manufacturing and Converting Machinery divisions.

  • End-to-end schedulingEvery order sequenced from raw material through to dispatch.
  • Live production trackingJob status followed stage by stage across the shop floor.
  • On-time deliveryCommitted dates protected through proactive capacity planning.
What we plan

The disciplines behind on-time delivery

From the moment an order is confirmed, planning coordinates people, machines and materials so nothing waits and nothing is missed.

Planning & Scheduling

Each order is broken into operations and sequenced across machining, fabrication, coating and assembly — with realistic dates built from actual shop-floor capacity.

Material Control

Raw material, bought-out items and consumables are planned against every job, so the right steel and components reach the right machine at the right time.

Production Tracking

Work-in-progress is monitored operation by operation, giving early visibility of any bottleneck so schedules can be re-balanced before delivery is affected.

On-Time Delivery

Committed dates are protected end to end — coordinating inspection, packing and dispatch so finished machines and components ship on schedule.

Our methodology

Plan – Do – Check – Act (PDCA) Cycle

Every project is driven through a continuous improvement cycle — planned, executed, verified and refined for consistent, on-time delivery.

01

Plan

Define project goals, identify requirements, allocate resources and prepare a clear schedule to ensure every activity is planned effectively.

04

Act

Take corrective actions, implement improvements and standardise successful practices to ensure consistent quality and better performance in future projects.

02

Do

Execute the planned activities by coordinating teams, machines and materials while following the established process and timelines.

03

Check

Monitor progress, inspect results and compare actual performance against planned targets to identify delays or areas for improvement.